Project

General

Profile

CTP main activities (2024 - 2025)

99h spent during the last 2 two years on Douala-IX tasks mainly. We introduced AFRINIC nodes in the Exchange point. Clarifications are still need with RIPE regarding the K-root node.
Added by Willy Manga about 1 month ago

CTP activities between 2024 and 2025

Main activities

The core of our activities was the support of Douala-IX.

Support to Douala-IX

Here are the highlights:

  • Installation and configuration of a new hypervisor: hyperv2.std.douala-ix.net ( grant from ISOC )
  • Mattermost instance : https://discuss.douala-ix.net/
  • Hosting of AFRINIC nodes
    • AFRINIC Anycast
    • AFRICA ccTLD name server
  • Add INX as secondary authoritative servers
  • usual upgrade of systems ( where applicable ) :
    • Debian (11 -> 12 -> 13)
    • OpenBSD (7.6 -> 7.7 -> 7.8 )
  • Misc support
We spent in average : 99h32 minutes
  • 63h25min in 2024
  • 36h07min in 2025

Details : https://redmine.std.douala-ix.net/projects/infrastructure/time_entries/report?query_id=25 (an overview is attached in this post)

Priorities for 2026

  • Decomission Mailman 2 on the VPS hosted by AFRINIC
  • Upgrade or change that VM to a more recent Debian version
  • Install a brand new instance running on mailman 3
  • develop a solution for the lab

Comments